Guide for practices

How to prepare a Mohs lab for a CLIA inspection

A Mohs lab with a Certificate of Compliance or Accreditation is surveyed every two years, by the state agency for CMS or by its accreditation organization; in California, CDPH Laboratory Field Services does the state and federal inspections. Surveyors tour the lab, review records from the whole period since the last survey, watch staff work and interview them. To prepare, make sure your procedure manual, QC, temperature and maintenance logs, accuracy checks and personnel files are complete, signed and easy to pull.

Who inspects, and how often

CMS says a lab with a Certificate of Compliance or a Certificate of Accreditation that performs non-waived testing gets surveyed every two years, by CMS, the state agency or a CMS-approved accreditation organization. Mohs frozen-section histopathology is non-waived testing (see which CLIA certificate a Mohs lab needs).

  • Certificate of Compliance: the state agency surveys for CMS. In California that is CDPH Laboratory Field Services; its Los Angeles office handles the state and federal inspections.
  • Certificate of Accreditation: your accreditation organization inspects under its own standards, and CMS runs validation surveys on a limited percentage of accredited labs.
  • Frequency can change. Under 42 CFR 493.1777, CMS may inspect more often when it decides that's needed, and bases later inspections on the lab's compliance history. It may also reinspect at any time or inspect after a complaint (42 CFR 493.1773).

Announced or unannounced?

For state agency surveys, CMS's State Operations Manual says it is generally CMS policy to use announced surveys, with up to two weeks' notice. Complaint surveys and follow-up or revisit surveys are unannounced. If the lab cancels an appointment for an initial or recertification survey, the next one may be unannounced. Notice is short, so keep records current all year.

What happens on survey day

The survey includes a tour, record review, observation and interviews with staff involved in every phase of testing. The lab must let surveyors watch staff work, interview personnel, see testing and storage areas, and get copies of the records they need within a reasonable time (42 CFR 493.1773). Surveyors pick the records themselves, from the whole period since the last survey, and check that earlier deficiencies were corrected.

What surveyors review in a Mohs lab

Area What the rule requires Rule
Procedure manual Written procedures for every test, followed by staff. Procedures and changes are approved, signed and dated by the current laboratory director before use, with dates of initial use and discontinuance. 493.1251
Reagents and conditions Reagents and stains labeled with identity, storage requirements, and preparation and expiration dates; nothing used past expiration. Temperature and other storage and operating conditions monitored and documented. 493.1252
Maintenance Maintenance and function checks on the cryostat and other equipment, at least as often as the manufacturer specifies, documented. 493.1254
Controls and stains Staining materials checked for intended reactivity each day of use; a control slide with each special stain; immunohistochemical stains checked for positive and negative reactivity each time of use. All control procedures documented. 493.1256, 493.1273
Accuracy verification At least twice a year for tests with no proficiency testing program, which includes Mohs. CMS tells surveyors to check this for the whole period, not just shortly before the survey. 493.1236(c)
Competency Staff doing high-complexity testing evaluated at least semiannually in their first year, then at least yearly, using methods that include direct observation and review of QC and maintenance records. 493.1451
Director oversight The director is on site at least every 6 months (at least 4 months apart) and documents the visits, and puts each person's duties and authorized procedures in writing. 493.1445
Personnel files Surveyors check that people in CLIA positions are qualified, and look for direct evidence such as degrees and transcripts. Staff, including contract staff, are listed on Form CMS-209. Subpart M; SOM § 6116.4
Retention Histopathology slides at least 10 years from examination; pathology reports at least 10 years; QC and other analytic records at least 2 years; retired procedures 2 years after discontinuance. 493.1105

For the daily and periodic logs behind these rules, see the Mohs lab quality-control checklist.

Pre-survey checklist

  • Your current CLIA certificate, posted, with a certificate type that matches the testing you do.
  • Procedure manual: current, signed and dated by the current director, and matching what the lab does.
  • Retired procedures kept, with their start and end dates.
  • Cryostat and stainer maintenance and function-check logs, with no gaps since the last survey.
  • Temperature logs for the cryostat and reagent storage, with corrective action noted when out of range.
  • Daily stain checks; control slides for any special stains or IHC.
  • Reagents and stains labeled with preparation and expiration dates; expired stock removed.
  • Twice-yearly accuracy verification records for every period since the last survey.
  • Competency assessments for each tech, on schedule, with the required elements.
  • Personnel files with diplomas or transcripts, training records and written duties; Form CMS-209 up to date.
  • Records of the director's on-site visits.
  • Slides and reports retained and retrievable for the required periods.
  • A named contact who can pull any record quickly while the surveyor is there.

After the survey: Form CMS-2567 and the plan of correction

Findings come in writing on Form CMS-2567, the Statement of Deficiencies and Plan of Correction. CMS's State Operations Manual says the state agency sends it within 10 working days of completing the survey, and the lab has 10 calendar days after receiving it to return a plan of correction (PoC). For standard-level deficiencies, the regulation requires a plan "acceptable to CMS in content and time frames" (42 CFR 493.1816). Condition-level findings call for a credible allegation of compliance (AoC) instead: records showing the lab is already in compliance, with no future correction dates. CMS can also impose sanctions for condition-level noncompliance (42 CFR 493.1806).

CMS says a plan of correction must state:

  1. How the deficient practice will be, or was, corrected.
  2. What corrective action was taken for patients affected by it.
  3. How the lab identified other patients who could be affected, and what it did for them.
  4. What systemic changes keep the deficient practice from recurring.
  5. How the corrective action is monitored.
  • Correction dates must fall within 12 months after the "date survey completed" on the form.
  • The laboratory director or another authorized official signs and dates the form.
  • You can disagree with a finding and send documentation, but you still provide a plan.
  • The form can be disclosed to the public; never refer to another lab or malign an individual on it.

For a new lab, the CMS brochure says that if deficiencies are found, you won't get your Certificate of Compliance until you've fixed them.

How Mohs Pros helps

Mohs Pros has served 100+ clients, primarily in California, providing specialized Mohs laboratory services. As part of CLIA compliance support, we help practices with:

  • A procedure manual written for how your Mohs lab actually works
  • QC, temperature and maintenance logs, and catching gaps before a surveyor does
  • Personnel files, competency records and written duties
  • A walk-through of the checklist above before the survey, and help drafting the plan of correction after it

Mohs Pros supports this work; the laboratory director stays responsible for compliance, and no one can promise a survey result. Opening a new lab? Start with how to set up a Mohs lab.

Questions

Will we know the date of our CLIA survey in advance?
Usually. CMS’s State Operations Manual says it is generally CMS policy to use announced surveys, with up to two weeks’ notice. Complaint surveys and follow-up or revisit surveys are unannounced, and an initial or recertification survey may be unannounced after the lab cancels one appointment. Accredited labs follow their accreditation organization’s process.
Who inspects a Mohs lab in California?
For a Certificate of Compliance, CDPH Laboratory Field Services surveys for CMS; CDPH says its Los Angeles office handles the state and federal inspections. A lab with a Certificate of Accreditation is surveyed by its accreditation organization.
Can we choose which records the surveyor reviews?
No. CMS tells surveyors not to let the lab select the records for review, and to look at records from the whole period since the last certification survey. Every month of logs needs to be complete, not just the weeks before the visit.
How long do we have to answer a CMS-2567?
CMS’s State Operations Manual says the state agency sends the Form CMS-2567 within 10 working days of completing the survey, and the lab has 10 calendar days after receiving it to return a plan of correction (or, for condition-level findings, a credible allegation of compliance). Follow the dates in your own notice.
Is the statement of deficiencies public?
It can be. CMS says the Form CMS-2567 discloses to the public the lab’s deficiencies and what is being done to remedy them, so write the plan of correction knowing others may read it.
Can Mohs Pros guarantee we pass?
No one can. Mohs Pros helps with the procedure manual, logs, personnel files and preparation, but the laboratory director stays responsible for compliance, and the outcome is the surveyor’s decision.

Sources

Checked October 11, 2026.

General information for practices, not legal or medical advice. Rules change and vary by state and accreditor; confirm with CMS, your state agency or your accreditor.

Getting ready for a CLIA survey?

Mohs Pros helps Mohs labs put the procedure manual, logs and personnel files in order before the surveyor arrives, and with the follow-up if there are findings.